Footpath work at the lakeside

Work on the footpath to the jetty has started. Our usual access route is blocked, as is the route past the cafe.

It is possible to use the ditch crossings along the road to the Young Mariners club, (the second is a built up crossing) – they should have finished laying the tarmac on that part of the path by Friday.

Please allow extra time to get to the jetty. It is possible that we can use the normal route at the end of the day, as we will easily be able to talk to the workmen.